RETIE electrical design and utility permitting for construction firms

We support new build and refurbishment from the Series design through to certified handover. One electrical contractor accountable for the design, the permitting, the installation and the commissioning.

The starting point

On site, the electrical work rarely delays construction — it delays handover

The structure goes up, the masonry advances, the finishes go in. And then, three weeks from handover, the problem surfaces: the utility application has not been filed, or it has been filed with a design that needs correcting, or the RETIE certificate will not be issued because parts of the installation do not comply. The building is finished but cannot be energised — and without power there is no handover and no closing.

That bottleneck almost always has the same origin: the electrical scope was contracted in pieces. One engineer did the design, a different contractor did the installation, and nobody owned the permitting. When the network operator asks for a correction, the designer has moved on and the installer says he built what he was given. Working with an integrator removes that grey area: one firm is accountable for the design, the execution and the certification.

Get a quote

Critical points

What it takes to energise a project

The sequence is well known, but how long it takes is consistently underestimated. Each step depends on the previous one, and the network operator works to its own timescales, which pressure will not shorten.

01

Electrical design under the Series matching the project's load.

02

Filing and approval of the design with the network operator before building.

03

Execution in line with the approved design, with no field changes left off the drawings.

04

RETIE certification issued by an accredited body — a prerequisite for connection.

05

NTC 2050 compliance in conduit, protection devices, panels and service entrances.

06

As-built drawings and updated calculation reports for handover and for the owners' association.

Our scope

What we do on construction projects

We come in wherever we are needed: at design stage during the concept phase, or with the build already under way when the previous contractor has not delivered. Usually we take on the complete package of power, telecommunications and security, because coordinating it across three separate suppliers tends to cost more than contracting it together.

01 · Design

Series electrical design

Series electrical design with drawings, calculation reports and load schedules.

02 · Permitting

Utility application

Full management of the utility application through to approval.

03 · Assembly

Substations and networks

Installation of substations, service entrances, conduit and internal networks.

04 · Voltage

Low and medium voltage

Low- and medium-voltage installations to code.

05 · Certification

RETIE certification

Support through to the project's RETIE certification.

06 · Networks

Data and security

Structured cabling, fibre optics, CCTV and access control.

07 · BIM

BIM coordination

BIM coordination to catch clashes before building.

08 · Supply

On site supply

Supply of certified materials and equipment delivered to site.

What applies here

Services for this sector

On new build the complete package almost always applies, from design through to certification.

Tools

Software we work with

We design, model and document every project with professional engineering, BIM, calculation and visualization tools.

AutoCAD
AutoCAD
Revit
Revit
Navisworks
Navisworks
Dynamo
Dynamo
IFC
IFC
Rhinoceros
Rhinoceros
SketchUp
SketchUp
DIALux
DIALux
Twinmotion
Twinmotion
Power BI
Power BI
Visual Studio Code
VS Code
Python
Python
JavaScript
JavaScript
AutoCAD
AutoCAD
Revit
Revit
Navisworks
Navisworks
Dynamo
Dynamo
IFC
IFC
Rhinoceros
Rhinoceros
SketchUp
SketchUp
DIALux
DIALux
Twinmotion
Twinmotion
Power BI
Power BI
Visual Studio Code
VS Code
Python
Python
JavaScript
JavaScript

Frequently asked questions

Your questions, answered

How far in advance should the utility application be filed?
The earlier the better. The operator has its own review times and any comment restarts part of the process. The sensible approach is to have the design filed well before the build reaches the installations stage, not after.
Can you take over a project already started by another contractor?
Yes. It is a common situation. We survey what has actually been built, compare it against the approved design and determine what can be kept and what has to be corrected in order to certify.
Do you provide as-built drawings and calculation reports?
Yes. We hand over documentation updated to reflect what was actually built, which is what the owners' association or the owner will need later for any maintenance or extension.

More sectors

Other sectors we serve

We work as integrators for companies and projects across different sectors, adapting each solution to the technical and regulatory demands of every industry.

Have a project in design, or a build that cannot get energised?

Tell us what you need and get a tailored quote. We advise you from the very first idea.